摘要
讨论了煤田三维地震勘探测量的限差关系、精度和方法,并应用到晋城成庄矿三维地震勘探测量放线工作中,提高了三维地震勘探测量的精度和工作效率,有较高的实用价值。
This paper discusses the limiting error, precision and method of three-dimensional seismic survey in the coalfield, exemplified by the application of the method to the line arrangement of three-dimensional seismic exploration in the Chengzhuang coal mine of Jinzhong Prefecture. The precision of the data and the efficiency of actual operation have been improved. The method is used effectively in the three-dimensional seismic exploration.
出处
《物探与化探》
CAS
CSCD
2005年第6期548-550,共3页
Geophysical and Geochemical Exploration
关键词
三维地震勘探测量
定位精度
极限误差控制
three-dimensional seismic exploration survey
positioning precision
control of limiting error