1[1]Trumbo M, Kalagnanam J, Lee H. IBM Research Report: A Solution Architecture for Inventory Application Problems in the steel Industry. Unpublished Results, 1998
2[5]D. N. Brain, G. P. George and R. S. Nada. A hierarchical production plan for a make-to-order steel fabrication plant.Production Planning and Control. 2004, 15(3):324-335
9Chen Chienyu, Zhao Zbenying, Ball M O. Quantity and due date quoting available to promise[J]. Information Systems Frontiers, 2001,3(4) :477-488.
10Jeong B J,Sim S B, Jeong H S, et al. An available-to-promise system for TFT LCD manufacturing in supply chain [J]. Computers and Industrial Engineering,2002,1-2(43):191-212.