摘要
结合天津奥林匹克中心体育场工程,介绍了利用天然湖作为冷却池的参数确定及湖平面设计,具体包括冷却循环水系统流程、冷却池排热量计算、冷却湖的工程布置、湖水水质处理等。
For Tianjin Olympic Center Stadium Project, parameters determination of a natural lake used as cooling pond and the layout plan of the lake were introduced, including the flow scheme of recirculating cooling water system, calculation of heat released from cooling pond, engineering arrangement for the lake, and the lake water treatment, etc.
出处
《中国给水排水》
CAS
CSCD
北大核心
2005年第12期72-73,共2页
China Water & Wastewater
关键词
冷却池
蒸发值
水处理
cooling pond
evaporation value
water treatment