期刊文献+

风电场运行状况后评估活动设计 被引量:2

Design of Wind Farm Performance Improvement Program
下载PDF
导出
摘要 中国政府获得了一笔来自日本的气候变化赠款,用来实施风电场运行情况后评估项目,旨在提高中国现有风电场的技术水平和推动风力发电的商业化进程。该项目将由中国可再生能源发展项目办公室管理,并与中国龙源电力集团公司协作实施。项目活动包括:提供安装气象监测和记录设备;收集、分析、解释数据并采取纠正措施;制定标准,信息宣传和能力建设。 China has received a Japanese-funded Climate Change Initiative grant to undertake a pilot wind farm performance mprovement component.The purpose of the activity is to demonstrate improvements to the technical and commercia performance of a limited number of existing wind farms in China. The activity will be managed by the REDP Project Management Office( PMO ) ,in cooperation with China Long Yuan Power Company( Long Yuan ). The work program includes three components supply and installation of meteorological measurement and recording equipment; collection,analysis and interpretation of wind and other meteorological data and taking corrective actions; and benchmarking, dissemination and capacity building.
出处 《中国建设动态(阳光能源)》 2005年第12M期50-52,共3页
关键词 风电场 后评估 能力建设 Wind Farms Performance Improvement Capacity Building
  • 相关文献

同被引文献5

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部