工程量清单计价模式下的招投标方式 被引量:2

Calling for Bid and Tendering Way under Model of Quantities Figure
原文传递
导出
摘要 采用工程量清单计价招标,已经成为我国工程招标发展的必然趋势。与传统的招标方式相比,该招标模式能够有效地引入竞争机制,淡化标底的作用,在保证质量、工期的前提下,最终以不低于成本的合理低价中标。作为招标人员必须尽快熟悉适应这种方式和规则的改变,并把握住工程量清单编制、合理低价者中标、签订合同等招投标工作中工程造价管理的重点。 Tendering with project quantity valuation has become inevitable tendency for tender developing in our country. Compared with traditional, the model can effectively lead into competitive mechanism, weaken base number of a tender and finally win the bidding with a “not less than cost” reasonable low price on the premise of assurance of quality and deadline. A tenderer should know well and fit the change of this pattern and regulation and have good command of key point of project cost management in the tendering work of drawing up quantity, winning a bidding with a reasonable low price and signing a contract etc.
作者 徐培军
出处 《上海建设科技》 2005年第6期59-61,共3页 Shanghai Construction Science & Technology
关键词 工程量清单 计价模式 招投标工作 project quantity valuation model tender and invitation for a bid
  • 相关文献

同被引文献4

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部