摘要
通过对厦门市仙岳路东段城市快速路SMA路面施工的全过程跟踪,从原材料选择、配合比设计、混合料拌和、运输、摊铺、碾压等方面入手,提出了适合南方高温多雨气候的城市SMA路面施工质量控制措施。
This paper presents the construction quality control control measures of SMA road in southern city with high temperature and more rain from such aspects as raw material selection, gradation design, mixing, transportation, paving, rolling, ect.
出处
《筑路机械与施工机械化》
北大核心
2005年第1期29-31,共3页
Road Machinery & Construction Mechanization