期刊文献+

闸上交通桥预应力混凝土施工技术 被引量:1

Construction Technology of Pre-stressed Concrete at the Floodgate Transportation Bridge
下载PDF
导出
摘要 阐述闸上交通桥施工的特点,结合某闸上交通桥预应力混凝土的施工,叙述闸上交通桥预应力施工的工艺,包 括预应力混凝土的材料、预应力施工工具的选择和质量控制,预应力混凝土空心板梁的预制工艺,后张法预应力的施 加技术。 The author elaborates the characteristic of a floodgate transportation bridge construction, narrates the pre-stressed concrete construction techniques of the floodgate transportation bridge including the pre-stressed concrete material, the choice of pre-stressed construction tools, the quality control, the prefabricated techniques of pre-stressed concrete hollow plate and crossbeam, and the construction technology of post-tensioned prestressing concrete.
作者 崔绍炎
出处 《南水北调与水利科技》 CAS CSCD 2005年第6期56-57,共2页 South-to-North Water Transfers and Water Science & Technology
关键词 闸上交通桥 预应力 施工 floodgate transportation bridge pre-stress, construction
  • 相关文献

参考文献3

  • 1[4]JTJ 041-2000,公路桥涵施工技术规范[S].
  • 2[2]SL 27-91,水闸施工规范[S].
  • 3[3]JTG F80/1-2004,公路工程质量检验评定标准[S].

共引文献86

同被引文献8

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部