摘要
根据西南铝“1+4”热连轧工程设备的特点及要求,提出了质量监理控制的要点及实施方法。
In view of the characteristics and requirements of installations of SWA "1 + 4" hot tandem project, the main points of supervision and controlling and actions were put forward.
出处
《铝加工》
CAS
2005年第6期36-38,共3页
Aluminium Fabrication
关键词
安装
安装质量
监理
控制要点
installation
quality
supervision
controlling points