摘要
建筑施工中基础的沉降对于设备良好安装有重大影响,尤其是大型旋转设备要求轴心精确在一条中心线上,对于确保设备良好运转至关重要。从监测方法、数据分析、时间控制等方面进行了有益的探索,对于其它的施工基础监测控制具有借鉴意义。
The foundation settlement in construction has an important effect on equipment mounting, especially for large rotary equipment, its axial center should be mounted in the center line and it is very important for good running of the equipment. The helpful study is carried out in monitor methods, data analysis and time control, which gives a reference to monitor and control of other construction foundations.
出处
《冶金动力》
2005年第6期4-5,共2页
Metallurgical Power
关键词
高炉鼓风机
基础
沉降
控制
blast furnace blower
foundation
settlement
control