摘要
单项施工方案是为了解决工程重点难点等复杂技术问题的,针对性较强的一种施工措施,是技术人员灵活应用技术解决现场问题的体现,反映出企业解决实际问题的技术能力和应变能力。
Monomial construction scheme is a pertinent construction measure, which could solve many difficult and complex technical problems. It is the embodiment of the ability for technicians to solve the problems in-field flexibly, and it could reflect the ability to solve practical problems and response in case of emergency of the enterprises.
出处
《重庆建筑》
2005年第12期47-49,共3页
Chongqing Architecture
关键词
高层建筑后浇带
单项施工方案
high-rise building post-casting zone
monomial construction scheme