摘要
根据国际工程EPC项目合同的特点,全面阐述了国际工程项目中预试运、试运和投料开车的概念、准备工作和实施步骤,强调了试运准备对确保试运成功的意义,对以子系统为基本单元的试运体系的优点进行了简要说明,对试运准备期间需报业主审批的、有时间要求的事项做了充分的提示,为今后国际项目的运作在试运方面提供了可借鉴的方法和程序。
According to the characteristics of international engineering project contract,this paper expatiates on the concept,preparative work and executive procedure for pre-commissioning,commissioning and start-of-run of an international engineering project. It stresses the importance of preparative work to guarantee successful commissioning.
出处
《石油工程建设》
2005年第6期75-78,共4页
Petroleum Engineering Construction
关键词
国际工程
预试运
试运
投料开车
准备工作
international engineering
pre-commissioning
commissioning
start-of-run
preparative work'