某发电厂于1998年实施了200MW汽轮机组的给水泵改造工程,将电动给水泵改为小汽轮机拖动的汽动给水泵。对这次改造进行的热经济性对比试验,结果表明改造达到了预期的效果。
The feedwater pump improvement project of steam turbine group 200MW in Power Plant has been implemented in 1998. The hot economic contrast to test this transformation has been made, which manifests this transformation is very meaningful.
出处
《流体机械》
CSCD
北大核心
2005年第12期5-7,共3页
Fluid Machinery
关键词
给水泵
改造
热经济性对比试验
the feedwater pump
transformation
test for the hot economic contrast