期刊文献+

网络化制造环境下投标项目选择策略研究

The study on strategy of selection bidding project based on network-based manufacturing
下载PDF
导出
摘要 在分析了待选盟员投标项目选择的重要性的基础上,给出了评价网络化制造环境下待选盟员投标项目选择的模糊层次分析法模型。这种分析模型综合考虑了影响投标项目选择的多项决策因素,为待选盟员盟主企业正确选择投标项目提供了决策依据。 Analysis is made on the importance of the choice of the bid projects made by those leaguers to be selected, based on which fuzzy AHP mode of how to evaluate the choice of the bid projects made by those leaguers to be selected under the environment of network is put forward. The mode gives a comprehensive con- sideration for the various evaluation factors affecting the choice of the bid projects, according to which member enterprises and leader enterprise to be selected can select bid projects correctly.
出处 《机械设计与制造》 北大核心 2005年第12期167-169,共3页 Machinery Design & Manufacture
关键词 企业联盟 评判模型 决策因素 模糊层次分析法 Enterprise alliance Analytic model Evaluation factor Fuzzy AHP
  • 相关文献

参考文献2

二级参考文献2

  • 1常大勇,经济管理中的模糊数学方法,1995年
  • 2王莲芬,层次分析法引论,1990年

共引文献106

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部