摘要
结合广东省阳江核电站工程实际,对工程建设中造成的水土流失,按功能分区进行了详细预测,并根据项目水土保持方案的设计原则分析了做好水土保持工作的必要性,提出了做好核电站水土流失治理的措施,同时对所选的植物物种进行了简单分析。
In combination with the engineering practice of Guangdong Yangjiang Nuclear Power Station. the water and soil losses caused by the engineering construction are forecast at length according to different use sectors. Based on the design principles of the water and soil conservation scheme of the project, the necessity of water and soil conservation is analyzed and measures for preventing soil and water losses of the station are presented. Meanwhile. the selection of plant species is analyzed briefly.
出处
《广东电力》
2005年第11期22-25,共4页
Guangdong Electric Power
关键词
阳江核电站
水土保持
水土流失
Yangjiang Nuclear Power Station
water and soil conservation
soil and water losses