摘要
主要根据五龙金矿裂隙涌水量大及排水费用占采矿成本1/3的实际情况,介绍历年应用过的堵水方法及评价其应用结果。
build up water method that applicated over the years was introduced in this arctice and application consequence was evaluated, according to crack gushing warte large and drain expense account mining costing one third.
出处
《黄金科学技术》
2005年第6期35-38,44,共5页
Gold Science and Technology
关键词
岩金矿山
大水矿区
堵水方法
应用结果
rock gold mine
inundation mine area
build up water method
application consequence