通过对二滩电厂推力/下导油槽油雾产生原因的分析和油雾治理过程的介绍,阐述了大型半伞式发电机组 推力油槽油雾防治的一般方法。
The 550 MW hydroelectric generating sets of Ertan Hydropower Plant were designed and made by contract to Hydro GE (Canada). The oil mist appeared after the oil spun-off from the thrust/lower-guide bearing had been dealt with. This paper analyzes the cause of forming mist from oil sump of the thrust/lower-guide bearing, introduces the measures against oil mist for the units. The general approaches to prevent and control oil mist for large semi-umbrella hydroelectric generating sets are proposed.
出处
《水电站机电技术》
2005年第6期14-16,共3页
Mechanical & Electrical Technique of Hydropower Station
关键词
水力发电机组
推力油槽
油雾
防治
hydroturbine generator set
thrust bearing oil sump
mist
prevention and control