摘要
通过RUNBACK试验,达到单台辅机故障停机时,各模拟量控制系统及燃烧管理系统的协调动作,将机组各主要参数控制在正常运行范围内,达到停机不停炉,从而保证了机组及电网的安全运行。
During Runback test,when single auxiliary unit was shutdown,each MCS and FSSS acts coordinately to maintain the main parameters of the unit in normal operating range. When unit is shutdown, the boiler is still working. In this way the safe operation of unit and power network is guaranteed.
出处
《华北电力技术》
CAS
2005年第12期1-3,共3页
North China Electric Power