摘要
平潭海峡大桥是一大型桥梁工程,桥位自然条件恶劣.本文根据该桥的实际情况,通过精心分析、反复比较、科学论证、选取较理想的桥位和桥线、合适的堤桥比例、经济的桥型、先进的结构、稳妥的施工方法和较短的工期。
The Pingtan Strait bridge in Fujian Province is a large bridge project with bad natural conditions in the site and short in investment capital. In this paper, the bridge scheme is analysed carefully, compared repeatedly, proved scientifically and designed conceptually with the ideal location and axis, appropriate ratio of the bridge to the bank, economical bridge type, advanced structure, safty and reliable construction methods and short time for construction. This bridge is designed to be the most economical one under the prerequisite of safty and servicebility.
出处
《福州大学学报(自然科学版)》
CAS
CSCD
1996年第4期1-9,共9页
Journal of Fuzhou University(Natural Science Edition)
关键词
大桥
桥位
方案
设计
strait bridge
bridge location
scheme
conceptual design
Fujian
Pingtan