期刊文献+

大顶子山航电枢纽工程建库后上游水质总量控制研究

Study On Control Of Totality Of Upper Stream Water Quality Of Reservoir Of Dadingzi Mountain Pivotal Project
下载PDF
导出
摘要 松花江大顶子山枢纽工程建设后,库区内水体流线及扩散规律的变化将影响库区内水质,受沿江排污影响,其规划目标的水环境容量将发生改变,因此对建库后上游水质总量控制进行研究很有意义。 When Songhua River Dadingzi Mountain pivotal project is completed, the change of water flow line as well as divergent law will have influence on water quality in the reservoir area. Affected by sewage discharge along the river, the change in water environment capacity of planned objectives will appear. Therefore, it has a certain meaning to make a study on control of totality of upper stream water quality of the reservoir.
作者 张波
出处 《环境科学与管理》 CAS 2005年第6期58-62,共5页 Environmental Science and Management
关键词 航电枢纽 库区流域 污染物 总量控制 水质管理 功能区划 shipping and generating pivotal project reservoir drainage area pollutant control of totality water quality management function division
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部