摘要
松花江大顶子山枢纽工程建设后,库区内水体流线及扩散规律的变化将影响库区内水质,受沿江排污影响,其规划目标的水环境容量将发生改变,因此对建库后上游水质总量控制进行研究很有意义。
When Songhua River Dadingzi Mountain pivotal project is completed, the change of water flow line as well as divergent law will have influence on water quality in the reservoir area. Affected by sewage discharge along the river, the change in water environment capacity of planned objectives will appear. Therefore, it has a certain meaning to make a study on control of totality of upper stream water quality of the reservoir.
出处
《环境科学与管理》
CAS
2005年第6期58-62,共5页
Environmental Science and Management
关键词
航电枢纽
库区流域
污染物
总量控制
水质管理
功能区划
shipping and generating pivotal project
reservoir drainage area
pollutant
control of totality
water quality management
function division