摘要
比较分析了德国德西尼布公司与英国克莱德公司捞渣机系统的差异,介绍了国华粤电台山电厂调试期间出现的问题,并针对国华粤电台山电厂使用德国德西尼布公司与英国克莱德公司捞渣机系统的现状提出了几点优化建议。
The SSC of Unit 1,2 and 3 in Guohua Yedean Taishan Power Plant Co. are imported, the difference of this two sets of system is analyzed in this paper, it also introduces the problems happened during commissioning. It might be referenced during designing and improving SSC. Moreover, some advice is given to optimized the SSC system operation according to its condition.
出处
《锅炉制造》
2005年第4期36-37,40,共3页
Boiler Manufacturing
关键词
锅炉
捞渣机
分析
优化
boiler
SSC ( scraped submerged conveyer)
analysis
optimization