摘要
介绍了公伯峡水电站(5×300 MW)微机调速器的交叉冗余实现方案、双机切换原则和切换 方法,同时指出了双可编程逻辑控制器(PLC)微机调速器在国内大型、巨型水轮发电机组上运行的 可行性。
The crossing redundancy scheme of the digital governor and dual PLC switch principle and switch method of the Gongboxia Hydropower Station (5×300 MW) are introduced. The feasibility of dual PLC digital governor running on the domestic large or huge water-turbine generator set is pointed out.
出处
《水电自动化与大坝监测》
2005年第6期26-27,共2页
HYDROPOWER AUTOMATION AND DAM MONITORING