摘要
探讨了混凝土坝段分块浇筑施工中基岩产生的沉降变形,在考虑空间、时间及环境效应量并 引入自重因子相互作用的影响下,建立了施工期基岩沉降模型,取得较好的效果,并给出了实例。
The distortion of concrete dam block caused by foundation settlement during the construction period is discussed. Considering the factors of space, time, environment and gravity, a foundation settlement model for the construction period is established. A case is provided to prove that the model is satisfactory.
出处
《水电自动化与大坝监测》
2005年第6期56-57,61,共3页
HYDROPOWER AUTOMATION AND DAM MONITORING
关键词
混凝土坝
自重荷载
耦合作用
基岩
沉降模型
concrete dam
gravity load
coupling effect
foundation
settlement model