安徽电建二公司在上海外高桥电厂二期(2×900 MW机组)工程6号机组建设中,紧紧围绕“创精品工程”的目标,通过严格的管理和科学的手段,不断寻求管理创新,使机组的安装和调试质量均达到优良标准,6号机组提前84天投入商业运行,并在上海市的迎峰度夏中发挥了重要作用。
During construction of No. 6 unit (900 MW) in Shanghai Waigaoqiao Power Plant, phase Ⅱ Anhui No. 2 Electric Power Construction Engineering Company has taken strict scientific management measures to seek for innovation of management continuously and as a result the installation and commissioning quality of the unit has met the good standard. The unit was put into commercial operation 84 days ahead of the schedule and played an important role during the peak load period of Shanghai.