摘要
在昭平船闸对槛下两区段分散输水系统的设计、研究及运行经验基础上,设计了巴江口船闸输水系统的关键尺寸及布置型式。12∶0整体物理模型试验研究表明:巴江口船闸输水系统的布置与设计整体上是合理的,各输水水力特征的设计值与模型试验值非常吻合,达到了预期的设计目标。
Based on the design and research on dispersed filling and emptying system of two blocks under sill and operation experience of Zhaoping Shiplock, the key dimensions and layout of the filling & emptying system of Bajiangkou Shiplock are designed. The 1:20 overall physical model experimental research result proves that the layout and design of the filling & emptying system of Bajiangkou Shiplock is reasonable in general, and the design values of all hydraulic features tally well with the model test results, reaching the prospective goal of design.
出处
《水运工程》
北大核心
2005年第12期45-49,共5页
Port & Waterway Engineering
关键词
船闸
输水系统
水力学
模型试验
shiplock
filling & emptying system
hydromechanics
model test