摘要
结合嵌岩桩在南海石化马鞭洲15万吨级原油码头的应用实践,对嵌岩桩的设计和施工控制要点进行探讨,以期对后续类似工程起借鉴作用。
This paper discusses the main points in design and construction of rock-socketed piles combining with Nanhai Petro-chemical Mabianzhou 150 000 dwt Crude Oil Terminal engineering, hoping to serve as a reference for future projects.
出处
《水运工程》
北大核心
2005年第12期76-78,共3页
Port & Waterway Engineering
关键词
嵌岩桩
设计
施工
rock-socketed pile
design
construction