基于台背加固后的桥头搭板长度数值计算与分析 被引量:5

Analysis and numerical calculation for the length of approach slap based on the strengthened filling of the abutment
下载PDF
导出
摘要 设置桥头搭板和加铺土工格栅是处理桥头跳车的两种主要措施.当桥台台背填土的回弹模量提高后,所需桥头搭板长度可以减小甚至搭板完全取消,本文利用重庆梁(平)长(寿)高速公路土工格栅处治桥头跳车得到的有关地基模量提高的数据资料,借助有限元计算手段,计算地基模量、桥台高度与搭板长度之间关系,为桥头搭板的正确设计和施工提供依据. Setting approach slap and paving geogirds are two primary measures to reduce the bridge head bump, The length of the approach slap should be shortened even be cancelled as enhancing the rebound module of the padding in the back of the abutment. According to the data of the ground module heightened by paving geogirds to deal with the bridge head bump in the freeway from Liangping to Changshou in Chongqing, This article analyses the relation among the ground module, the depth of abutment and the length of the approach slap, which can be referenced in the correct design and construction of the approach slap by utilizing finite element program.
出处 《重庆交通学院学报》 2006年第2期38-41,共4页 Journal of Chongqing Jiaotong University
关键词 桥头跳车 桥头搭板 有限元 地基模量 桥台高度 bridgehead-bump approach slap ground module abutment depth finite element
  • 相关文献

参考文献3

二级参考文献3

共引文献83

同被引文献33

引证文献5

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部