摘要
结合上海轨道交通6号线15A标龙阳路站地下连续墙围护工程的施工实际,介绍了吊装法施工地下连续墙的施工工艺、施工技术和主要施工设备选型。
Taking the construction of the underground diaphragm walls of Longyanglu station of line 6 of the Shanghai's MRT system as example, the author describes the construction process, construction technology and selection of majorconstruction equipment of the construction of the diaphragm walls by means of hoisting-assembling method.
出处
《隧道建设》
2005年第6期25-27,31,共4页
Tunnel Construction
关键词
连续墙
设备选配
施工技术
diaphragm wall
equipment selection
construction technology