摘要
结合地下铁道工程施工技术标准,重点阐述了1 m厚44 m深地下连续墙的施工方法,对幅段接头、钢筋笼的制作及吊装进行了较深入的研究和探讨,对类似施工具有一定的参考价值。
According to the construction technology standards of underground railway works the construction method of 44 m deep underground continuous wall with 1 m thickness is mainly introduced. In view of the lifting and fabrication of steel reinforcement cage deep research and discussion are made in order to provide references for similar works in the future.
出处
《山西建筑》
2006年第1期147-148,共2页
Shanxi Architecture
关键词
地下连续墙
幅段接头
钢筋笼的制作
吊装
underground continuous wall, splice, fabrication of steel reinforcement cage, lifting