摘要
结合工程实例,论述了冷却塔人字柱脚手架的搭、拆方法,从施工、管理制度、外界条件等方面介绍了人字柱脚手架的安全控制措施,从而保证冷却塔人字柱的施工质量和人员安全。
Combined with practice the erection and demolition method of scaffold in herringbone column construction of cooling tower are discussed. From construction, management system, external conditions and other aspects practical safety control measures are introduced in order to ensure construction quality and personal safety.
出处
《山西建筑》
2006年第1期155-156,共2页
Shanxi Architecture
关键词
人字柱
脚手架
搭拆方法
herringbone column, scaffold, erection and demolition method