尼尔基水利枢纽工程厂房布置及优化 被引量:3

Arrangement and design optimization of the power house of Ni'erji water conservancy project
下载PDF
导出
摘要 尼尔基水利枢纽工程发电厂房为河床式厂房,总装机容量4×62.5MW。在厂房布置时,充分考虑了工程建设的具体情况,同时结合厂房设备和结构方面的要求,具有机动、灵活、实用的特点,最大限度地进行了优化设计,其中包括新材料、新技术的应用。该设计为同类型发电厂房的布置和优化积累了经验。 The power house of Nierji hydroproject is a water retaining type one with a total installed capacity of 4×62.5 MW; are its characteristics. During design of the power house, specific conditions are fully considered as well as requirements of equipment and structure. Optimized design has been implemented to a maximum extent, which has characteristics such as flexibility and practicality. Among these, the uses of new material and technique provides precious experience for arrangement and design optimization of the other similar power houses.
出处 《水力发电》 北大核心 2005年第11期30-32,共3页 Water Power
关键词 厂房布置 设计优化 尼尔基水利枢纽 layout of power house optimized design Ni'erji water conservancy project
  • 相关文献

同被引文献13

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部