摘要
提出了砌筑焦炉前首先应编制详尽严谨的施工计划与工期,砌筑中严格筑炉规范。就近年来焦炉砌筑中多次出现的问题提出了比较详细的解决方法。
This paper points out that before the construction of the coking oven, should compile the detailed and strict construction plan and construction period, and should implement the norms of the construction of the coking oven strictly, and puts forward some detailed methods for solving the problems frequently occurring in the construction of the coking ovens.
出处
《科技情报开发与经济》
2005年第24期225-226,共2页
Sci-Tech Information Development & Economy
关键词
焦炉砌筑
施工计划
施工工期
construction of coking oven
construction plan
construction period