摘要
为使深基坑的土方开挖能在基本无水的条件下进行,必须事先做好基坑的降水工作。介绍对深基坑的降水量计算、降水井的布置施作、降水井施作及运营期间的注意事项。
Doing well the precipitation work of deep foundation pit in advance in order to excavate earthwork of foundation pit under the condition without water basically. The calculation of precipitation volume, arrangements, construction and matters needing attention of precipitation well are introduced.
出处
《石家庄铁路职业技术学院学报》
2005年第4期48-51,共4页
Journal of Shijiazhuang Institute of Railway Technology
关键词
基坑降水
降水量计算
降水井施作
注意事项
precipitation of foundation pit calculation of precipitation volume construction of precipitation well matters needing attention