摘要
本文着重介绍了在利用水采工艺开采大倾角、薄煤层群的生产过程中通过改革巷道布置提高经济效益的经验。
The paper highlights the experience for enhancing the economic returns during hydromining thin composite seams with a large dip angle through improving the layout of wokings.
出处
《水力采煤与管道运输》
1996年第1期30-32,共3页
Hydraulic Coal Mining & Pipeline Transportation