摘要
介绍了高速公路现浇连续箱梁施工工艺及施工难点,提出了一种高速公路现浇连续箱梁模板支架实用预压控制方法,并结合实例对该方法进行了验证。
The paper introduces construction technology cast in place on freeway, poses the approach which the beam controlling, and has verified it with examples. and difficult points in construction mould board frame can be suitable of continuous beam for precompression
出处
《辽宁交通科技》
2005年第12期37-39,共3页
Liaoning Communication Science and Technology
关键词
桥梁
连续箱梁
浇注支架
预压方法
Bridge Continuous box beam Cast frame Precompressing approach