期刊文献+

龙滩水电站右岸高边坡安全监测成果分析 被引量:1

Monitoring analysis on the right-bank high slope of Longtan hydropower station
下载PDF
导出
摘要 龙滩工程右岸高边坡地质条件复杂,坝后边坡存在风化深槽。施工期间,多次出现险情,并发生一次规模较大的滑坡。通过安全监测,对边坡变形动态地及时监测和预报,避免或减小了工程损失,保证了工程施工顺利。根据监测成果分析,经采取锚索和锚固洞等措施加强支护后,目前边坡趋向稳定。 The geological structure of the slope at the right-bank of Longtan Hydropower Station is very complex. It has a large district which was deeply air-slaked and eroded rock-earth. Damage case or potential harm situation have occurred many times and a huge volume of slope slide took place during the course of construction. The cases were under being monitored and predicted to prevent or minimize loss in order to ensure construction activity safety. Now the slope condition trends to be stable according to the analysis of monitoring results after it was improved strength by anchorage cables and piles.
出处 《大坝与安全》 2005年第6期32-35,共4页 Dam & Safety
关键词 龙滩水电站 高边坡 安全监测 成果分析 Longtan hydropower station high slope safety monitoring result analysis
  • 相关文献

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部