期刊文献+

浙江的潮汐发电实践 被引量:7

Utilization of Tidal Power in Zhejiang Province, China
下载PDF
导出
摘要 浙江是我国潮汐能资源丰富的省份之一。潮汐能的利用可追溯到1958年。我国目前最大的江厦潮汐试验电站于1985年冬建成,运行良好,取得了显著的经济效益和社会效益。本文就浙江省潮能利用历史作了回顾,对现有的电站予以简单介绍,并探讨了潮汐电站的选址原则。文末还提出了开发利用潮汐能资源的若干建议。 Zhejiang is one of provinces rich in tidal power resources in China. The utilization of tidal power can be dated back to 1958. The largest one of tidal power stations in China, Jiangxia Experimental Tidal Power Station with the installed capacity of 3200kW was built up in winter, 1985. The station runs in good condition, the economical and social benefits are notable. This paper covers historical review of the utilization of tidal power, a brief description of the existing tidal power stations, also discusses the rules for selecting site of the stations. A few suggestions for development and utilization of the tidal power resources are presented.
作者 赵雪华
出处 《水力发电学报》 CSCD 北大核心 1996年第1期25-36,共12页 Journal of Hydroelectric Engineering
关键词 潮汐水电站 潮汐能 试验 Tidal power station, Utilization of tidal power, Jiangxia Experimental Tidal Power Station
  • 相关文献

参考文献6

  • 1赵雪华,能源工程,1991年,3期
  • 2团体著者,1988年
  • 3陆德超,潮汐电站,1985年
  • 4程锋,第二届全国海洋能源利用学术讨论会议文集,1984年
  • 5沙锡林,第二届全国海洋能源利用学术讨论会议文集,1984年
  • 6赵雪华,东海海洋,1983年,1卷,2期

同被引文献48

引证文献7

二级引证文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部