期刊文献+

BPR过程中企业职能部门设计的研究 被引量:2

A study on the design of section of enterprises in the course of BPR
下载PDF
导出
摘要 企业业务流程再造提倡从流程的角度而不是职能的角度来组织企业资源。因此,企业在进行BPR的过程中为了达到整个业务流程的系统最优化,必然要对企业的职能部门进行重新设计,确定各个职能部门的集中程度和相互关系,从而在组织结构上保证流程再造的实施效果。 Business Process Reengineering advocates that enterprises should organize their resources from the perspective of business process, instead of functional perspective. From this point of view, enterprises will inevitably redesign their functional departments; define the Concentrating Degree of Function and relationship between them, so as to promise the effect of implementing Business Reengineefing and make the whole business optimization.
出处 《农业与技术》 2005年第4期158-161,共4页 Agriculture and Technology
关键词 业务流租再造 职能集中度 业务相关度 流程集成度 Business Process Reengineefing The Concentrating Degree of Function The Connecting Degree of Business The Concentration Degree of Business
  • 相关文献

参考文献4

  • 1H詹姆斯·哈林顿.业务流程改进[M].北京:中国财政经济出版社,2002(12).14-15.
  • 2黄国青,赵嵩正.企业流程再造中存在问题分析及对策研究[J].西北工业大学学报(社会科学版),1999,19(3):21-24. 被引量:7
  • 3张继焦.价值链管理[M].北京:中国物价出版社,2001..
  • 4BJosephPineⅡ.大规模定制-企业竞争的新前沿[M].北京:中国人民大学出版社,2000(7).130-131.

二级参考文献1

共引文献48

同被引文献17

  • 1戚晓曜.基于约束理论的管理方法及其应用[J].工业工程,2005,8(1):19-23. 被引量:28
  • 2寿志钢,马卫.企业流程再造:失败的原因和成功的步骤[J].企业经济,2005,24(6):48-50. 被引量:11
  • 3[2]Goldratt E.M.The goal[M].Great Barrington.MA:The North River Press,1st ed.1984,2nd ed.1986,2nd revised ed.1992.
  • 4[3]ZHANG G H,CAI X Q,WONG C K.S0me resuhs on resource constrained scheduling[J].1iE Transactions,2004,36(1):1-9.
  • 5[5]UZSOY R,WANG C S.Performance of decomposition Drocedures for job shop scheduling problems with bottleneck machines[J].Int.J.of Production Research,2000,38(6):1271-1286.
  • 6[6]MOSS H K,Yu WB.Toward the estimation of bottleneck shiltness in a manufacturing operation[J].Production and Inventory Management Journal,Second Quarter,1999:53-58.
  • 7[7]NAKATA T,MATSUI K,MIYAKE Y.et a1.Dynamic bottleneck control in wide variety production factory[J].IIE Transactions on Semiconductor Manufacturing,1999,12(3):273-279.
  • 8[8]Hoda EIMaraghy.A Genetic Algorithm Based Approach for Scheduling of Dual-Resource Constrained Manufacturing Systems[J].Annals ofthe CIRP,1999,48(1).
  • 9Hammer M. , Champy J. Reengineering the corporation: a manifeso for business revolution. New York, Harper Collins, 1993.
  • 10Zhang G H ,Cai X Q ,Wong C K. Some results on resource constrained scheduling[J].IIE Transactions , 2004,36(1) : 1-9.

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部