期刊文献+

水垫塘底板冲击压强和流速分布研究 被引量:5

Investigation of impact pressure and velocity distributions on the stilling basin
下载PDF
导出
摘要 雅砻江干流梯级水电站大坝具有高水头、大流量、河谷狭窄的特点,消能问题突出。研究选定水垫塘内流态、底板冲击压强作为优化指标,通过改变坝身孔口尺寸、二道坝高程等手段,达到在控制水垫塘底板冲击压强的同时,使得在各种工况下泄洪水股纵向拉开、横向归槽并避免对下游河道的冲刷。 The energy dissipation problems are severe to huiht hydropower stations on the Yalong River, as it has high water head and large discharge rate, and mountain valley is narrow. Based on the impact pressure and the velocity distributions on the stilling basin, the shape optimizations of the outlets in the dam are made by changing the sizes of the outlets and the elevation of the second dam. This results in that the impact pressure values on the stilling basin can be reduced, and the tr ojactoryes nf the water jets from the outlets can be controlled both in longitudinal and horizontal directions, the river bed erosion can also avoided.
机构地区 清华大学
出处 《水力发电》 北大核心 2005年第12期28-30,共3页 Water Power
基金 国家自然科学基金项目资助(50379022)
关键词 泄洪消能 水垫塘 冲击压强 流速分布 Energy dissipation stilling basin impact pressure velocity distribution
  • 相关文献

参考文献5

二级参考文献7

  • 1-.小湾水电站增大坝身泄量减少一条泄洪洞方案的泄洪消能研究(坝身泄量分配研究)[M].北京:中国水利水电科学研究院水力学所,1998..
  • 2-.小湾水电站泄洪消能试验研究[M].北京:中国水利水电科学研究院水力学所,1995..
  • 3-.小湾水电站泄洪消能布置优化方案研究[M].北京:中国水利水电科学研究院水力学所,1999..
  • 4艾克明.挑流消能的冲刷破坏及防治[J].泄水工程与高速水流,1995,(3).
  • 5陈椿庭.高坝大流量泄洪建筑物[M].北京:水利电力出版社,1998..
  • 6王奎译.欣古坝的消能系统[A]..见:峰谷建坝布置及消能防冲译文集[C].北京:水利出版社,1983..
  • 7刘沛清,高季章,李忠义.水垫塘的水流特征及其综合评价指标[J].长江科学院院报,1997,14(1):1-6. 被引量:6