小浪底水利枢纽工程的合同价格调整体系与方法

Contract price adjustment system and method of Xiaolangdi Multipurpose Dam Project
下载PDF
导出
摘要 小浪底水利枢纽主体土建工程采用国际招标方式选择承包商,为了减轻通货膨胀、国内外劳务费差异等市场因素的影响,在承包合同中制定有合同价格调整的条款。结合工作实践,介绍了小浪底水利枢纽工程合同价格调整体系与方法,提出了相关的意见和建议。 Contractors in Xiaolangdi Multipurpose Dam Project were selected through international competitive bidding process. In order to mitigate the impact of currency inflation, labour cost from local and abroad as well as other factors on the project, some contract price adjustment provisions were made in the contract. This paper presents the contract price adjustment system and method applied in Xiaolangdi Multipurpose Dam Project, in consideration of the practices, and produces some relevant comments and suggestions.
作者 黄维华 陈敏
出处 《水力发电》 北大核心 2005年第12期68-70,79,共4页 Water Power
关键词 合同价格调整 FIDIC条款 关税 价格指数 国际水利水电工程承包 小浪底水利枢纽 Contract price adjustment FIDIC clauses custom duties price index international hydro construction contract Xiaolangdi multipurpose dam project
  • 相关文献

参考文献5

  • 1李武伦.建设合同管理与索赔[M].郑州:黄河水利出版社,2002.143-146.
  • 2朱卫东.浅谈国际合同的外币价格调整[C].黄河小浪底建设管理文集,北京:中国水利水电出版社,1997,99—105.
  • 3殷保合.黄河小浪底水利枢纽工程(施工舱理篇)[M].北京:中国水利出版社,2004.53-107.
  • 4李淑敏.浅谈小浪底工程合同索赔中的调价与变更[C].黄河小浪底建设管理文集,北京:中国水利水电出版社,1997.80-88.
  • 5田威.FIDIC合同中的价格调整和调价公式[J].国际经济合作,1995(2):46-50. 被引量:4

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部