摘要
分析了一起220kV隔离开关远控拒分、合闸故障的原因,介绍了中宁电厂2×330MW扩建工程电气系统纳入DCS监控后的电气系统控制的特点,并对电气控制回路组态修改问题进行了探讨。
Analyzes the cause of 220kV isolating switch rejecting remote control opening and closing accident, introduces the characteristics of electrical system control to bring into DCS monitoring in 2×330MW expanding project of Zhongning Power Plant, discusses the problems of electric control loop configuration modification.
出处
《宁夏电力》
2005年第5期52-54,共3页
Ningxia Electric Power
关键词
电气控制
DCS组态
合闸
分闸
electric control
DCS configuration
closing switch
opening switch