摘要
介绍了青铜峡水电站#5机转轮叶片取消悬吊孔后,转轮体吊装方式的改造及吊装设备的安装和使用,为日后同型号水轮机转轮体吊装改造提供有关技术经验。
Introduces the improvement for body of rotate wheel's hoisting mode and use of hoisting equipments after the hang hole of rotate wheel vane have been canceled in ^#5 hydraulic turbine unit in Qingtongxia Hydropower Plant offers correlative technical experience for hoisting improvement of the same type of hydraulic turbine rotate wheel.
出处
《宁夏电力》
2005年第C00期20-21,共2页
Ningxia Electric Power
关键词
转轮
主轴
支持盖
吊装
改造
rotate wheel
principal axis
sustaining cover
hoisting
improvement