摘要
2003年黄河断流量为往年的50%左右,水资源日趋匮乏,为确保大坝电厂机组的稳发、满发,必须在净水环节上下功夫,即采用直径为100m的幅流式沉淀池和直径为29m的机械加速澄清池最优排泥方式,达到节水的目的。
Due to the shortage of water resources, especially Huanghe set-off volume reached abeut 50% than last year. In order to assure generation units steady operation must optimize the link of purifying water: adopt best ways of mud discharge by D100M radial flow precipitation tank, D29M mechanical agitation settling pond to save water.
出处
《宁夏电力》
2005年第C00期270-273,共4页
Ningxia Electric Power
关键词
节水
净水环节
排泥
含沙量
积泥量
save water
, link of purifying water
mud discharge
volume of sand content
sludge volume