摘要
简要介绍了韶关钢铁集团有限公司炼轧厂液压升降裙板式上卸钢装置控制系统的原理,同时对其运行中出现的问题进行了分析,并采取了相应的改进措施,使该系统的故障率由10%降至0.5%。
The principle of control system of the skirt-plated hydraulic-powered loading-disharging unit was simply introduced. Meanwhile, the existing problems of the system were analyzed and the countermeasures were put forward.
出处
《轧钢》
2005年第6期60-62,共3页
Steel Rolling
关键词
棒材
裙板式冷床
拨钢器
扣板
延时时问
bar
skirt-plated cooling bed
pulling machine
buckle plate
delay time