大隆水利枢纽工程施工测量的受控性和时效性

Controlled feature and time-effectiveness of construction survey for Dalong Water Control Project
下载PDF
导出
摘要 大隆水利枢纽工程坝区地形起伏显著,建筑物覆盖面大,汛前竣工的分部工程多且相互关系紧密。因此,要求施工测量具有较强的受控性和明显的时效性。施工测量中采用了全球定位系统(GPS)和全站仪等先进的仪器和技术,它们在及时完成控制测量和细部测量中发挥了重要作用,取得了好的效果。 So far as Dalong Water Control Project is concerned, the dam site is located in an area with an undulant landform, the coverage of the structures concerned is large and the appurtenant works to be completed before flood season are many with close interrelations. Therefore, the strongly controlled features and significant time-effectiveness of the construction survey are required. Under this circumstance, the advanced instruments and techniques such as total station and GPS are applied during the construction survey, which play important roles in the controlled survey and the detailed survey with good effects.
作者 魏建飞
出处 《水利水电技术》 CSCD 北大核心 2005年第12期16-19,共4页 Water Resources and Hydropower Engineering
关键词 施工测量 全球定位系统 全站仪 大隆水利枢纽 construction survey GPS total station Dalong Water Control Project
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部