摘要
以西牛潭水库加固设计为例,论述了如何用多年调节法进行径流计算和灌溉调节计算,并最终确定灌溉库容。
This paper took Xiniutan reservoir reinforcement as a example, discussed how to use pluriennal regulation methods to calculate the quantity of runoff and irrigation, and defined irrigation storage capacity in the end.
出处
《水利科技与经济》
2006年第1期27-28,共2页
Water Conservancy Science and Technology and Economy
关键词
多年调节
水库加固
设计
pluriennal regulation
reservoir reinforcement
design