摘要
对江苏电网近几年大机组非计划停运情况进行了分析,通过分析比较得到了影响大机组非计划停运的主要因素,提出了降低大机组非计划停运的措施,为江苏电网并网发电机组提高可靠性提供了依据。
Based on the analysis of unplanned outage of unit in Jiangsu electric power system for several years, finding out the main factors which affect the unplanned outage of unit, put forwarding the measures which can reduce the unplanned outage of unit,providing some methods to improve the reliability for generating unit in Jiangsu Electric power system.
出处
《江苏电机工程》
2006年第1期59-61,共3页
Jiangsu Electrical Engineering
关键词
江苏电网
机组
非计划停运
分析
Jiangsu electric power system
unit
unplanned outage
analysis