期刊文献+

半导体生产线建模及其仿真若干关键技术研究——基于Simul8建模仿真软件 被引量:2

Studies of Key Issues in Simulation and Modeling of Semiconductor Production Line--Based on Simul8 Software
下载PDF
导出
摘要 为满足半导体生产线建模与仿真在仿真性能、仿真真实性等方面的较高要求,基于Simul8复杂系统仿真软件对半导体硅片制造生产线进行建模和仿真的过程中,提出了非动态加工区和动态加工区的分类的思想,探讨了各自基于Simul8的实现方法,同时分析并有效解决了工序加工时间和运输时间的统计计算问题。仿真应用表明,提出的方法在增强半导体生产线仿真真实性的同时,也有效改进了仿真的性能。 In order to meet the performance and reality request for simulation and modeling of semiconductor production line,a strategy to distinguish static inter-relationship process region and dynamic inter-relationship process region is proposed.And their realization based on Simul8 are further explored respectively.Meanwhile,the problem of step processing time and translation time is also analyzed and solved sueeessfully.Simulation result shows that both of the performance and reality of simulation can be improved.
出处 《计算机工程与应用》 CSCD 北大核心 2006年第1期187-189,197,共4页 Computer Engineering and Applications
基金 国家973基础研究发展规划资助项目(编号:2002CB312202) 国家自然科学基金资助项目(编号:60374005)
关键词 建模 仿真 二级缓冲区 Simul8 modeling,simulation,semiconductor production line,Simul8
  • 相关文献

参考文献5

  • 1Kim J,Desrochers AA,Modeling and analysis of semiconductor manufacturing plants using time Petri nel models :COT bosiness case study[C].In:IEEE International Conference on Systems,Man,and Cybernetics. 1997:3227-3232.
  • 2王中杰,吴启迪,有杰.基于多目标的半导体生产线满意调度[J].控制与决策,2002,17(6):856-856. 被引量:4
  • 3王中杰,吴启迪.半导体生产线控制与调度研究[J].计算机集成制造系统-CIMS,2002,8(8):607-611. 被引量:25
  • 4Wein L M.Scheduling networks of queues:heavy traffic analysis of a two-station network with controllable inputs[J].Operations Reserarch, 1992;40(2) :312~334.
  • 5乔非 李莉 吴启迪.基于有色Petri网的分层半导体生产线调度模型[C]..第五届全球智能控制与自动化大会(WCICA’04)[C].,..

二级参考文献9

  • 1席裕庚.复杂工业过程的满意控制[J].信息与控制,1995,24(1):14-20. 被引量:47
  • 2石锦惠.基于Petri网的半导体生产线调度问题研究[M].上海:同济大学,1999..
  • 3[1]LiShu,TangTom,Collins Donald W.Minimum inventory variability schedule with applications in semiconductor fabrication[J]. IEEE Trans on Semicond Manuf,1996,9(1):145-149.
  • 4[2]Lu Steve C H, Ramaswamy D, Kumar P R. Efficient schedulingpoliciestoreduce mean and variance of cycle-time in semiconductor manufacturing plants[J]. IEEE Trans on Semicond Manuf,1994,7(3):373-388.
  • 5[3]Harrison J M, Wein L M. Scheduling networks of queues: Heavy traffic analysis of a two-station closed network[J]. Oper Res,1990,38(6):1052-1064.
  • 6[4]Little J D. A proof for the queueing formula: N=λW[J]. Oper Res,1961,9(3):383-387.
  • 7[5]Wein L M. On the relationship between yield and cycle-time in semiconductor wafer fabrication[J]. IEEE Trans on Semicond Manuf,1992,5(2):156-158.
  • 8[7]Yaron K, Gideon L. Multi-criteria scheduling optimization using fuzzy logic[A]. Proc of the IEEE Int Confon Systems, Man and Cybernetics[C],1998.445-450.
  • 9赵丽娜.可重入生产系统的调度优化与性能分析[M].北京:中国科学院自动化研究所,1999..

共引文献26

同被引文献12

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部