2010年三峡电站全部机组投运后,枯水期华中电网与三峡电站配套的火电补偿容量需6000MW,本文认为至少应有4300MW分布在河南省网。在分析计算的基础上,本文提出了2010年枯水期河南电网装机应达到的容量及与湖北500kV交流联络线的回数。
All the generating sets of the Three Gorges Power Station will go into operation in the year 2010. Then in Central China Power System there should be about 6000MW of thermal electric compensation capacity to meet the needs of the Three Gorges Power System in dry season.The authors consider that it will be rational to arrange at least 4300MW of the compensation capacity in Henan Power System. On the basis of analysis and calculation, the in-stalled capacity of Henan Power System which should be at-tained in the year 2010 and the number of 500kV tie lines by which the Henan and Hubei Power System will be intercon-nected is put forward in this paper.
出处
《电网技术》
EI
CSCD
北大核心
1996年第9期1-5,共5页
Power System Technology
关键词
三峡电站
电网
补偿容量
计算
Three Gorges Power Station
Central China Power System
Henan Power System
Compensatingcapacity