期刊文献+

基于悬链线元的索穹顶形状精确确定方法 被引量:5

Accurate Form-Finding Method for Cable Dome Based on Catenary Element
下载PDF
导出
摘要 针对目前索穹顶结构研究中其形状确定方面所存在的不足,提出了基于悬链线元逆迭代的精确修正技术,可以精确求得预张力;使其能在考虑索杆自重的情况下,在给定的初始几何位置上严格平衡.由于刚度矩阵形成和已知索的预张力情况求解索原长是运用悬链线元进行结构分析时需要解决的两个先决问题,首先根据目前文献中处理这两个问题的不足,提出了具有大范围收敛性的刚度迭代技术和不需迭代的索原长高精度求解方法;在此基础上引进逆迭代方法,建立了基于悬链线元的逆迭代形状精确确定方法.最后编制程序对算例进行验证,结果表明这一方法精度极高,且收敛速度快,收敛性好. In this paper, an iterative algorithm in form-finding of cable dome structures is proposed to determine precisely the prestress of the cable dome and the original length of the cables which are definitely balanced in the initial geometrical condition with the effect of self-weight taken into account. The most important issues in analyzing cable structures by using eatenary elements are how to effidently calculate the element stiffness matrix and the original length of cables. In this study, a globally convergent method is proposed first to calculate the element stiffness matrix and a direct method to obtain the original cable length is then employed. These methods can solve the inadequacy of the iterate algorithms presented in the literature. Based on these methods this paper finally presents a form-finding method by using eatenary elements. The results obtained from a benchmark problem demonstrate that the form-finding method proposed in this paper is efficient and accurate.
出处 《同济大学学报(自然科学版)》 EI CAS CSCD 北大核心 2006年第1期1-6,共6页 Journal of Tongji University:Natural Science
基金 国家自然科学基金资助项目(50108010)
关键词 索穹顶 悬链线元 索原长 形状确定 cable dome catenary cable original length form-finding
  • 相关文献

参考文献9

  • 1Pellegrino S. Structural computations with the singular value decomposition of the equilibrium matrix[J]. Int J Solids Structures,1993,30(21): 3025.
  • 2Calladine C R, Pellegrino S. First-order infinitesimal mechanisms[J]. Int J Solids Structures, 1991,27(4): 505.
  • 3Knudaon W C, Scordelis A C. Cable forces for desired shapes in cable-net structures[M]//IASS. Pacific Symposium on Tension Structures and Space Frames. Tokyo: Architectural Institute of Japan, 1972: 93-102.
  • 4向锦武,罗绍湘,陈鸿天.悬索结构振动分析的悬链线索元法[J].工程力学,1999,16(3):130-134. 被引量:19
  • 5张立新,沈祖炎.预应力索结构中的索单元数值模型[J].空间结构,2000,6(2):18-23. 被引量:28
  • 6Jayaraman H B,Knudson W C A. A curved element for the analysis of cable structures[J]. Computers and Stroctures, 1981,14(3-4):325.
  • 7Peyrot A H, Goulois A M. Analysis of flexible transmission lines[J], Journal of the Structural Division, ASCE, 1978,104(5):763.
  • 8William H P,Teukolsky S A. Numerical recipes in c[M]. Cambridge: Cambridge University Press, 2002.
  • 9张志宏,董石麟.张拉结构中连续索滑移问题的研究[J].空间结构,2001,7(3):26-32. 被引量:25

二级参考文献19

  • 1张立新,沈祖炎.预应力索结构中的索单元数值模型[J].空间结构,2000,6(2):18-23. 被引量:28
  • 2Law S S,Proc Bridges into the 21st Century Conf,1995年,585页
  • 3Bilal M. Ayyub, et al. Posttensioned trusses: analysis and design[J]. Journal of Structural Engineering,ASCE, 1990,116(6).
  • 4M. Aufaure. A there-node cable element ensuring the continuity of the horizontal tension: a clamp cable element[J]. Computers & Structures, 2000, 74: 243- 251.
  • 5Karoumi R. Dynamic response of cable-stayed bridges subjected to moving vehicles[C]. IABSE 15th Congress, Demark, 1996,87-92.
  • 6Walther R, Houriet B, Isler W, Moia P. Cable-stayed bridges[M]. London: Thomas Telford, 1988.
  • 7Raid Karoumi. Some modeling aspects in the nolinear finite element analysis of cable supported bridges[J]. Computers & Structures, 1999,71:397-412.
  • 8Abdel-Ghaffar Am. , Khalifa MA. Importance of cable vibration in dynamics of cable-stayed bridges[J].Journal of Engineering Mechanics, ASCE, 1991,117,2571-2589.
  • 9Leonard JW. Tension structures[M]. New York: McGraw-Hill, 1988.
  • 10Ali HM, Adbel-Ghaffar AM. Modeling the nonlinear seismic behaviour of cable-stayed bridges with passive control bearings[J]. Computer & Structures, 1995,54:461-492.

共引文献61

同被引文献58

引证文献5

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部