期刊文献+

孔系组合夹具夹紧方案自动规划方法 被引量:3

Automatic clamp planning approach for holes-system modular fixture system
下载PDF
导出
摘要 提出了基于实体模型的工件夹紧点自动确定方法和夹紧信息表示方法。采用了工件外轮廓的规约化方法,根据工件的规约化几何形状,确定工件满足夹紧要求的夹紧点个数,再进行夹紧点位置区域划分。从每个区域中各选择一个夹紧点组成一个夹紧方案,形成了可行夹紧方案集合。根据夹紧点位置、高度与受力多边形关系,来评价夹紧方案。 The automatic identification method for the feasible clamping point of a workpiece surface and the represen tation method for the clamping information based on the solid model were proposed. The reduction method of the projecting outline of workpiece was employed, and with the help of the reduced geometry of the workpiece, the number of necessary clamping point for given workpiece could be determined and the district of the feasible clamping points was established according to the location of each clamping point. The feasible clamping plan was constructed by selecting one clamping point from each district of clamping point of the workpiece. The clamping plan was evaluated according to the height and location of each clamping point and the relationship between the clamping points and the actual support region of the main datum plane of a workpiece.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2006年第1期100-104,153,共6页 Computer Integrated Manufacturing Systems
关键词 组合夹具 夹紧方案 自动规划 modular fixture clamping plan automatic planning
  • 相关文献

参考文献4

二级参考文献21

  • 1谷强.智能制造系统中自学习机制的研究[M].北京:北京航空航天大学,1999..
  • 2齐红威.人工智能在组合夹具组装设计中的应用:[硕士学位论文].天津:河北工业:大学,2001.
  • 3[1]Echave J, Shah J J. Automatic set-up and fixture planning for 3-axis milling. In:Proceedings of ASME design Engineering Technical Conferences, DETC99-DAC8571, 1999
  • 4[2]Brost R C, Goldberg K Y. A complete algorithm for designing planar fixtures using modular components. IEEE Transactions on Robotics and Automation, 1996, 12(1):31~46
  • 5[3]Brost R C, Peters R R. Automatic design of 3-D fixtures and assembly pallets. In:Proceedings of the 1996 IEEE International Conference on Robotics and Automation, 1996
  • 6[4]Wu Y, Rong Y, Ma W, et al. Automated modular fixture planning:geometric analysis. Robotics & Computer-Integrated Manufacturing, 1998, 14:1~15
  • 7[5]Wu Y, Rong Y, Ma W, et al. Automated modular fixture planning:accuracy, clamping, and accessibility analysis. Robotics & Computer-Integrated Manufacturing, 1998,14:16~26
  • 8[6]Zhuang Y, Goldberg K Y, Wong Y C. On the existence of modular fixtures. In:Proceedings of the 1996 IEEE International Conference on Robotics and Automation, 1994
  • 9[7]Penev K, Requicha A A G. Fixture foolproofing for polygonal parts. In:Proceedings of the IEEE International symposia on Assembly and Task Planning, Pittsburgh, PA, 1995
  • 10[8]Kumar A S, Fun J Y H, Kow T S. An automated design and assembly of interference-free modular fixture setup. Computer Aided Design, 2000, 32(2):583~586

共引文献56

同被引文献36

引证文献3

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部